Yoox Net-A Porter
A 45 meter long timber tunnel constructed out of more than 300 pieces form the Arbour Walk in the reception area of the 90,000 sqf new office for the YNAP IT hub. A reception desk clad in bronze with a lightbox to the front greets the guests on the second floor. VRDC also constructed five Teahouses located throughout the office. A natural pale aesthetic created using the combination of birch plywood and poplar battens.
- Type: Corporate
- Location: London
- What We Did: Construction and Installation